INCLUSION OF SWIFT NETWORK IN THE RTGS SYSTEM IN THE FIRST PHASE. REF: PSD CIRCULAR NO. 03 DATED 11.06.2015.

Further to PSD CIRCULAR NO. 02 DATED 06.04.2015 on implementation Roadmap for RTGS, we are pleased to inform you that initiatives have been taken to include SWIFT network as alternative of VPN connectivity in the first phase of RTGS operation keeping all the time schedules unchanged. The revised Functional Specification for BB-RTGS is forwarded for necessary action at your end.

Participating banks need to choose either VPN or SWIFT connectivity for RTGS operation and inform Bangladesh Bank by 31.07.2015.

Please acknowledge the receipt.

Leave a Reply

Your email address will not be published. Required fields are marked *